PROJECT DESCRIPTION

This world class project, in its fast track condition, consists of the internal remodeling of the industrial warehouse of Boston Scientific.

The innovative system used in the construction of the clean rooms, due to its character of prefabricated and walkable sky, streamlined the construction process. Many of the materials used, together with an efficient electrical design in terms of energy consumption, collaborated to make this project the first to be certified LEED-CI ® in the region. Several of the materials were imported directly by Constructora Proycon S.A, in its capacity as Construction Manager.

Among other relevant aspects it is worth noting that the prefabricated system of air conditioning type ice water with variable primary, was the first system installed in CR. Finally, the installed capacity is 3000 KVA, however it is the most efficient plant in the energy consumption of Boston Scientific worldwide.

PROJECT DETAILS

Categories:
Client: Boston Scientific de Costa Rica SRL
Location: Zona Franca Propark
Surface Area: 32000 m2
Completed: 2009

Do you want more information about our services?